Ashibaya - Scaffold Planner
足場屋さん
18 days old
Ashibaya - Scaffold Planner is #4 in Business Paid in Japan and charting in 1 of 24 countries we track.
Updated 27 Sep 2026 · rankings refresh through the day
DeveloperTSUYOSHI WADA
CategoryBusiness
Price1,000 JPY
Released
Rating★ 0.0 (0)
Version1.3.0
Age rating4+
First seen by us
26 Sep 2026
Rating
0.0 ★
0 ratings
Measured
Best rank now
#4
Measured
Ashibaya - Scaffold Planner on the App Store
App details
App ID
6809503123
Publisher
TSUYOSHI WADA
Minimum OS
iOS 15.0+
Content rating
4+
Languages
2
EN JA
Size
9 MB
Where Ashibaya - Scaffold Planner's downloads come from Modelled
Last 30 days: organic search, browsing the store, features and paid ads.
Where it ranks now
Every top chart it appears in across 24 countries.
| Country | Charts | Rank |
|---|---|---|
| BusinessPaid | #4 |
Apps near Ashibaya - Scaffold Planner on the chart
Business Paid, around #4.
Ratings
App Store, worldwide.
Rating
0.0 ★
0 ratings
Measured
Ratings
0
Measured
About Ashibaya - Scaffold Planner
Ashibaya helps you prepare scaffold material quantities for a site and compare them with the stock you have. Organize different scaffold systems into zones, review calculation assumptions, and keep an editable copy of your project.
PLAN BY ZONE
Enter dimensions and conditions for each zone. Use detailed wedge scaffold input for supported rows, obstacles and end conditions. Combine zones using dimension-based drafts or component recipes you register. Supported systems and sample components reflect Japanese scaffold types; confirm the actual products and conditions before use.
REVIEW STOCK AND COSTS
Register material specifications, unit weights, stock, purchase unit prices and daily rental rates. Find materials with shortages or missing information using filters and readable material cards. Unknown values remain unknown, and partial cost calculations are identified. Stock is not automatically reserved or reduced.
CHECK THE CALCULATION BASIS
Review each zone's calculation status, input errors, outstanding checks and calculation basis. Zones with errors are excluded from the combined quantities. Correct the inputs and calculate again before using the plan.
READ DRAWING PDFs
Review dimension candidates from a drawing PDF or calibrate point-to-point measurements against a known dimension. Check the dimension line, unit, scope and destination before applying a value to a zone. These aids do not replace your review of the drawing.
SAVE AND SHARE
Save projects on your device and reopen them from the project list. Export the current project as JSON, results as CSV, or output documents as PDF. Use project JSON to move an editable project to another device. Keep original drawing PDFs separately: project JSON does not include PDF files or back up the entire project list.
No account or login is required. Normal entry, calculations and local saving work offline in the installed app. External references and network-based sharing destinations need a connection. There is no automatic sync between devices.
UNITS AND SCOPE
The interface is available in Japanese and English. Dimensions use metric units and weights use kg. All purchase prices, daily rental rates and calculated costs are in Japanese yen (JPY). Changing language does not convert units or currency. Cost comparisons exclude transport, installation, base fees and tax.
Ashibaya supports material quantity planning. It does not perform strength calculations, approve designs or guarantee legal or construction safety compliance. The responsible person must verify site conditions, manufacturer specifications, layouts, supports, ties, connections and loads. Calculation scope and assumptions vary by system.
PLAN BY ZONE
Enter dimensions and conditions for each zone. Use detailed wedge scaffold input for supported rows, obstacles and end conditions. Combine zones using dimension-based drafts or component recipes you register. Supported systems and sample components reflect Japanese scaffold types; confirm the actual products and conditions before use.
REVIEW STOCK AND COSTS
Register material specifications, unit weights, stock, purchase unit prices and daily rental rates. Find materials with shortages or missing information using filters and readable material cards. Unknown values remain unknown, and partial cost calculations are identified. Stock is not automatically reserved or reduced.
CHECK THE CALCULATION BASIS
Review each zone's calculation status, input errors, outstanding checks and calculation basis. Zones with errors are excluded from the combined quantities. Correct the inputs and calculate again before using the plan.
READ DRAWING PDFs
Review dimension candidates from a drawing PDF or calibrate point-to-point measurements against a known dimension. Check the dimension line, unit, scope and destination before applying a value to a zone. These aids do not replace your review of the drawing.
SAVE AND SHARE
Save projects on your device and reopen them from the project list. Export the current project as JSON, results as CSV, or output documents as PDF. Use project JSON to move an editable project to another device. Keep original drawing PDFs separately: project JSON does not include PDF files or back up the entire project list.
No account or login is required. Normal entry, calculations and local saving work offline in the installed app. External references and network-based sharing destinations need a connection. There is no automatic sync between devices.
UNITS AND SCOPE
The interface is available in Japanese and English. Dimensions use metric units and weights use kg. All purchase prices, daily rental rates and calculated costs are in Japanese yen (JPY). Changing language does not convert units or currency. Cost comparisons exclude transport, installation, base fees and tax.
Ashibaya supports material quantity planning. It does not perform strength calculations, approve designs or guarantee legal or construction safety compliance. The responsible person must verify site conditions, manufacturer specifications, layouts, supports, ties, connections and loads. Calculation scope and assumptions vary by system.
Latest updates
1.3.0
Review building outlines before applying material quantities, and keep daily work reports.
• Review closed, right-angled outline candidates from plan drawings, or enter dimensions for a rectangle, L or U shape.
• Check each edge's length, height and scaffolded scope. Reference quantities count shared corner supports once between adjoining faces. Outlines with conflicting dimensions or unresolved conditions are held.
• Check the drawing, planned lengths and quantity basis, then review material changes before saving and applying them to the overall plan. Explicitly carry a revised PDF over as the same building and recheck its dimensions.
• Record the site, worker, working times, breaks and work done. Summarise regular hours, overtime and man-days using the company rules you set.
• Reports stay on the device. Review text or CSV and pass it on yourself using copy or the device's share options. There is no automatic email or LINE sending.
• Updated Japanese and English screens and user guides.
Material quantities are reference values for the scope you have checked. Verify the source drawing, site conditions, corner details and the selected manufacturer's configuration.